job #1362

Multi-Story Industrial Placement

February 10th 2026

Multi-Story Industrial Placement

This industrial pour utilized long-reach boom technology to navigate building obstructions and deliver concrete to elevated crews. Operators coordinated high-volume output from multiple mixers to maintain the placement rhythm required for a seamless structural slab.

Technical site preparation allowed for precise outrigger deployment within a restricted staging area. This project reinforces the Chaparral standard for reliability and reach on large-scale Texas developments.

  • Application: Multi-story Structural Decking

  • Fleet Depth: 38M to 58M Booms

  • Standard: Professional. Prepared. Proven.

  • Contact: 346-444-0805

PROJECT VIDEO


PROJECT gallery

Next
Next

Industrial Paving & Infrastructure